Krka River Bridge
General Information
| Structural Type: |
Arch bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Cantilever construction using temporary cable-stays
|
| Built: | 2002 - 2004 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Skradin, Croatia, Europe |
|---|---|
| Crosses |
|
| Coordinates: | 43° 48' 29.00" N 15° 54' 56.00" E |
Technical Information
Dimensions
| total length | 391 m | |
| arch | rise | 52 m |
| arch span | 204 m | |
| deck | width | 22.56 m |
| span lengths | 4 x 32 m - 3 x 28 m - 3 x 32 m - 28 m - 24 m |
Quantities
| structural steel | 1 700 t | |
| concrete volume | 12 000 m3 |
Materials
| deck |
composite steel-reinforced concrete
|
|---|---|
| arch |
reinforced concrete
|
Products, Services & Reports
DYWIDAG Bonded Post-Tensioning Systems Using Strands
DYWIDAG Bonded Post-Tensioning Systems Using Strands have been used for decades: in bridge construction, the construction of reservoirs and for man ...
TENSA®MODULAR Type LR
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions ...
Participants
Contractor
Steel construction
Stay cables
Expansion joints
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- DYWIDAG-Hilfsabspannungen sichern Bau der Krka-Bogenbrücke, in "DSI Info", 2005- 2006, n. 13
- Temporary DYWIDAG Suspension Cables secure Construction of the Krka Arch-Bridge, in "DSI Info", 2005- 2006, n. 13
- Two Notable Arch Bridges on The Croatian Adriatic Highway, in "Structural Engineering International", February 2010, n. 1 v. 20
Internal Information
| Structure-ID: | s0014275 |
|---|---|
| Created: | 06/11/2004 |
| Last Updated: | 05/03/2013 |
