General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
Vertical lift bridge Tied-arch bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Location
Location: |
Salford, Greater Manchester, North West England, England, United Kingdom Trafford, Greater Manchester, North West England, England, United Kingdom |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 53° 28' 11" N 2° 17' 44.04" W |
Technical Information
Dimensions
span | 92 m | |
clearance | max. 16 m |
Materials
arch |
steel
|
---|---|
towers |
steel
|
Notes
The span rises vertically by hydraulic power to 16m above water level to allow the pasage of ships.
The bridge connects the Lowry, an arts and theatre centre, with the Libeskind designed Imperial War Museum of the North.
The span was built about a mile away and floated into place on a pontoon.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbau im 20. Jahrhundert. Gestaltung und Konstruktion. Deutsche Verlags-Anstalt, Munich (Germany), pp. 141. (2004):
- About this
data sheet - Structure-ID
20013670 - Published on:
08/10/2004 - Last updated on:
05/02/2016