Brücke Untere Mühle
General Information
| Structural Type: |
Girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Incremental launching
|
| Built: | 1975 - 1976 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Trichtingen, Epfendorf, Rottweil (Kreis), Baden-Württemberg, Germany, Europe |
|---|---|
| Carries |
|
| Part of: |
Technical Information
Dimensions
| total length | 119 m | |
| span lengths | 37 m - 45 m - 37 m | |
| pier height | 22 m | |
| total width | 30.50 m | |
| deck | deck depth | 3.20 m |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Structural engineering
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0011018 |
|---|---|
| Created: | 14/12/2003 |
| Last Updated: | 27/02/2013 |
