• de
  • en
  • fr
  • International Database and Gallery of Structures

New Lioran Road Tunnel

New Lioran Road Tunnel

General Information

Structural Type: Tunnel
Function / usage: Road tunnel
Construction method: Drilling and blasting
Other name(s): Nouveau tunnel routier du Lioran
Built: 2003 - 2007
Duration of works: 22 months
Status: in use

Geographic Information & Related Structures

Location: Le Lioran, Laveissière, Cantal (15), Auvergne, France, Europe
Address: N122
To replace Lioran Road Tunnel (1848)
Coordinates: 45° 5' 3.00" N    2° 44' 19.00" E

Technical Information

Dimensions

height 4.50 m
total length 3 470 m
clearance 4.30 m
tunnel length 1 515 m
tunnel section area 100 m2
roadway / carriageway width 2 x 3.50 m

Quantities

concrete volume 40 000 m3
shotcrete 6 000 m3
explosives used 173 t

Cost

cost of construction Euro 78 570 000

Chronology

July 2003 End of 2005

Breakthrough.

End of 10 March 2006

Expected completion of the concrete cover of the tunnel structure.

Relevant Web Sites

Relevant Publications

Internal Information

Structure-ID: s0010107
Created: 02/09/2003
Last Updated: 19/04/2013