|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0006023 |
| Created on: |
10/06/02 |
| Modified on: |
05/10/05 |
|
 |
 |
|
 |  |  |
Puente Centenario |
| Panama Canal Second Crossing Bridge |
 |
|
Completed in:
|
2004
|
| Status: |
in use
|
|
Location: |
Panama
|
|
Crosses: |
Panama Canal
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|
| Part of: |
Panama Canal
|

| Legend: Phase of works |
| Role | Name | Part of structure |
| |
| Architect |
Miguel Rosales |
|
|

|
| Description | Value |
| deck |
concrete
|
| pylons |
concrete
|
|
| |
total length |
1 052 m |
| deck |
deck width |
34.30 m |
| main bridge |
main span |
420 m | | |
number of cables |
128 | | |
length of main bridge |
820 m | | |
number of lanes |
2 x 3 |
|
| |
steel for cable-stays |
1 320 t |
|

| 3 July 2004
|
| Final pour closes the deck. |
| 15 August 2004
|
| Expected opening. |
|

|

 |
Entre deux Amériques, in
"Sols et Structures", 2004, n. 220 .
|
 |
Freyssinet cable-stayed structures, Freyssinet International, Vélizy-Villacoublay (France) , 2004; pp. 73.
|
 |
Panama's kingsize lift, in
"Bridge Design & Engineering", 3rd Quarter 2004, n. 36 v. 10 .
|
 |
Bundesingenieurkammer Ingenieurbaukunst in Deutschland, Junius Verlag GmbH, Hamburg (Germany) , ISBN 3885065630, 2005; pp. 66-71.
|
 |
Humpf, Karl Cable-stayed Bridges across the Panama Canal and the Orinoco, presented at Improving Infrastructure Worldwide, IABSE Symposium, Weimar, 19-21.09.2007.
|
 |
Humpf, Karl Flying pace, in
"Bridge Design & Engineering", 2nd Quarter 2004, n. 35 v. 10 .
|
 |
Saul, Reiner Die zweite Brücke über den Panamakanal - eine Schrägkabelbrücke mit 420 m Mittelöffnung und Rekordbauzeit, in
"Beton- und Stahlbetonbau", March 2005, n. 3 v. 100 .
|
|
|
 |