• de
  • en
  • fr
  • International Database and Gallery of Structures

Crooked River Bridge

Rex T. Barber Bridge (New Crooked River Bridge)

General Information

Structural Type: Arch bridge
Function / usage: Road bridge
Construction method: Cantilever construction using temporary cable-stays
Built: 1998 - 2000
Status: in use

Geographic Information & Related Structures

Location: Terrebonne, Deschutes County, Oregon, USA, North America
Crosses
  • Crooked River
Next to Crooked River Bridge (1926)
Replaces Crooked River Bridge (1926)

Technical Information

Dimensions

arch span 124.97 m
height above valley floor or water 91.44 m

Materials

arch precast concrete

Notes

Arch construction: segmental cast-in-place, with two different form traveler systems.

Relevant Web Sites

Relevant Publications

  • Goodyear, David & Smit, N. Respect for tradition, presented at ARCH'01. 3ème conférence sur les ponts en arc.

Internal Information

Structure-ID: s0004513
Created: 16/08/2002
Last Updated: 05/03/2013