Crooked River Bridge
General Information
| Structural Type: |
Arch bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Cantilever construction using temporary cable-stays
|
| Built: | 1998 - 2000 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Terrebonne, Deschutes County, Oregon, USA, North America |
|---|---|
| Crosses |
|
| Next to |
Crooked River Bridge (1926)
|
| Replaces |
Crooked River Bridge (1926)
|
Technical Information
Dimensions
| arch span | 124.97 m | |
| height above valley floor or water | 91.44 m |
Materials
| arch |
precast concrete
|
|---|
Notes
Arch construction: segmental cast-in-place, with two different form traveler systems.
Participants
Owner
Design
Construction engineers
Construction
Stay cables
Form travelers
Relevant Web Sites
-
Bridge Pros: Crooked River Bridge
-
David Goodyear: Respect for Tradition - The New Crooked River Gorge Bridge
Relevant Publications
- Respect for tradition, presented at ARCH'01. 3ème conférence sur les ponts en arc.
Internal Information
| Structure-ID: | s0004513 |
|---|---|
| Created: | 16/08/2002 |
| Last Updated: | 05/03/2013 |
