|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0004444 |
| Created on: |
07/27/02 |
| Modified on: |
12/31/04 |
|
 |
 |
|
 |  |  |
|
|
|
|
Structural Type:
|
|

| Legend: Phase of works |
| Role | Name | Part of structure |
| |
| Erection engineer |
David Goodyear |
|
|

|
| Description | Value |
| deck of main bridge |
composite steel-reinforced concrete
|
| deck of approaches |
steel
|
|
| |
main span |
351 m | | |
total length |
1 208 m | | |
span lengths of main bridge |
143 m - 351 m - 143 m | | |
span lengths of approaches |
11 x 52 m |
| deck |
width |
31.5 m |
|
| |
cost of construction |
US$ 100 000 000 |
|

| 26 July 1996
|
| Groundbreaking ceremony and dedication of the bridge to Bill E. Emerson. |
| 12 August 2003
|
| The two halves of the bridge are connected mid-span. |
| 13 December 2003
|
| Opened to traffic. |
|

|

 |
Freyssinet cable-stayed structures, Freyssinet International, Vélizy-Villacoublay (France) , 2004; pp. 67.
|
 |
Un nouveau franchissement du Mississippi, in
"Sols et Structures", May - August 2003, n. 217 .
|
 |
Smooth closure for new Bill, in
"Bridge Update", September 2003, n. 38 .
|
 |
Hague, Steven T. Cape Girardeau Bridge Over the Mississippi River, presented at Structures Congress XIV held in Chicago, Illinois, April 15-18, 1996.
|
 |
Hague, Steven T. Seismic design for the Cape Girardeau cable-stayed bridge, presented at IABSE Conference, Malmö 1999 - Cable-stayed bridges. Past, present and future.
|
|
|
 |