Tonton-Nipah Bridge
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Balanced cantilever method
|
| Completed in: | 1997 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Tonton, Riau Islands, Indonesia, Asia Nipah Island, Riau Islands, Indonesia, Asia |
|---|
Technical Information
Dimensions
| main span | 160 m | |
| total length | 420 m | |
| clearance | 18 m | |
| deck | deck width | 18 m |
Materials
| deck |
prestressed concrete
|
|---|
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- VSL Completes the Longest Balanced Cantilever Bridge in Indonesia, in "VSL News", 1997, n. 1 v. 8
Internal Information
| Structure-ID: | s0004149 |
|---|---|
| Created: | 05/07/2002 |
| Last Updated: | 27/02/2013 |
