|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0001307 |
| Created on: |
11/02/01 |
| Modified on: |
13/03/04 |
|
 |
 |
|
 |  |  |
Nanjing Second Yangtse River Bridge |
| South Bridge |
 |
|
Built:
|
1997
- 2001
|
| Status: |
in use
|
|
Location: |
Nanjing, Jiangsu, China
|
|
Crosses: |
Yangtze River
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|
| Part of: |
Nanjing Second Yangtze River Crossing
|

|
|
TENSA®MODULAR Type LR |
| Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes. |
|
| Description | Value |
| deck |
steel
|
|
| |
main span |
628 m | | |
total length |
2.96 km | | |
length of main bridge |
1 238 m |
| deck |
deck depth |
3.144 m | | |
deck width |
37.2 m |
| pylon |
pylon height |
195.41 m |
|
| |
cost of construction |
ca. US$ 410 000 000 |
|

| October 1997
|
| Construction begins. |
| March 2001
|
| Opened to traffic |
|

|

 |
Andersen, Jacob E. Nanjing Yangtze River Bridge safety and comfort analyses, presented at IABSE Symposium, Antwerp, Belgium, 2003.
|
 |
Dai, Yongning Crossing the Yangtze, in
"Civil Engineering Magazine", February 2002, n. 2 v. 72 .
|
 |
Dajun, Ding Double Helping, in
"Bridge Design & Engineering", 4th Quarter 2000, n. 21 v. 6 .
|
 |
Lee, J. K. Grand Prix awarded to a Korean subcontractor, in
"VSL News", 1999, n. 2 v. 10 .
|
 |
Liu, Liping Second Nanjing Cable-Stayed Bridge, in
"Structural Engineering International", February 2004, n. 1 v. 14 .
|
 |
Tang, Man-Chung Leading edge, in
"Bridge Design & Engineering", 2nd Quarter 2001, n. 23 v. 7 .
|
|
|
 |