• de
  • en
  • fr
  • International Database and Gallery of Structures

Rennsteig Tunnel

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Tunnel
Function / usage: Road tunnel
Other name(s): Rennsteigtunnel
Official designation: 5315/06
Built: 1998 - 2003
Duration of works: 57 months
Status: in use

Geographic Information & Related Structures

Location: Zella-Mehlis, Schmalkalden-Meiningen, Thuringia, Germany, Europe
For
  • Autobahn A71
Part of:

Technical Information

Dimensions

tunnel section area 76 - 94 m2
on-axis distance between tubes 25 m
crossing tubes number 25
distance in-between 300 m
eastern tube length 7 878 m
tube diameter 7.5 m
roadway / carriageway width 1 m + 2 x 3.75 m + 1 m = 9.50 m
western tube length 7 916 m

Quantities

concrete volume 300 000 m3
excavated material 1 350 000 m3

Cost

cost of construction ca. Euro 201 000 000

Chronology

5 July 2003

Inaugurated by Chancellor Gerhard Schröder.

7 July 2003

Opened to traffic.

Relevant Web Sites

Relevant Publications

Internal Information

Structure-ID: s0000839
Created: 20/07/2000
Last Updated: 27/02/2013