Other name(s): Sunningesund Bridge
Beginning of works: 1997
Completion: 20 May 2000
Status: in use

Project Type

Location

Location: , ,
Coordinates: 58° 19' 32.25" N    11° 50' 38.70" E
Show coordinates on a map

Technical Information

Dimensions

main span 414 m
total length 1 712 m
span lengths 66 m - 5 x 88 m - 179 m - 414 m - 179 m - 3 x 88 m - 2 x 60 m - 50 m
number of spans 12

Quantities

structural steel 9 000 t
concrete volume 35 000 m³

Materials

cables steel
deck composite steel-reinforced concrete
pylons reinforced concrete

Case Studies and Applied Products

RESTON®ILM – Incremental Launch Bearing

RESTON®ILM – Incremental Launch Bearing

RESTON®ILM incremental launch bearings are used in the construction of bridges by the incremental launch method, and remain in service after completion of construction, taking on the role of the bridge's permanent bearings. This dual fun ... [more]

RESTON®POT – Pot Bearings

RESTON®POT – Pot Bearings

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.

[more]

Excerpt from Wikipedia

The Uddevalla Bridge (Swedish:Uddevallabron) is a cable-stayed bridge crossing Sunninge sound near Uddevalla in the province of Bohuslän on the west coast of Sweden. The bridge was constructed as part of the rerouting of the European route E06 outside Uddevalla, which reduced traffic congestion in the city and shortened traveling distance by 12.8 km (8.0 mi).

Dimensions

The total length is 1,712 m (5,617 ft), with a main span of 414 m (1,358 ft), there are a number of small approach spans at each end, and the two cable stayed side spans are 179 m (587 ft) each. It is 23.3 m (76 ft) wide, the clearance below the bridge is 51 m (167 ft), and the two pylons are 149 m (489 ft) high. The cables are organised in a semi-fan arrangement.

The bridge was constructed in 1996–2000 and was opened for traffic on 20 May 2000.

Construction notes

Structural engineering for the bridge was carried out by Johs Holt AS, and Skanska Teknik AB. Skanska also served as general contractor, with subcontractors Alpin Technik und Ingenieurservice GmbH (general), VSL International (cables), Mageba (bearings), and PERI GmbH (formwork and scaffolding).

The cables are steel and the deck is composite steel-reinforced concrete, while the pylons are reinforced concrete. About 9,000 t (20,000,000 lb) of structural steel and 35,000 m³ (1,200,000 cu ft) of concrete were used. The bridge and the connecting Sunningeleden cost of SEK 900 M (USD 111 M) in 2000 currency values. There is a problem with ice sticking to the cables in the winter, which can fall onto cars. The bridge has to be closed a few times per year for this reason. The alternative road is 12.8 km (8.0 mi) longer. Civil engineers have tested PETD (a way to use a burst of electricity to remove ice caked on walls or windows. For surfaces coated with a special film, the jolt gets rid of ice in less than a second, far less time than it takes to hack at it with an ice scraper).

Text imported from Wikipedia article "Uddevalla Bridge" and modified on 22 July 2019 under the CC-BY-SA 3.0 license.

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000589
  • Published on:
    14/01/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine