This already is the English Version Cliquez ici pour la version française Klicken Sie hier für die deutsche Version
International Database and Gallery of Structures Structures Large-scale Projects Persons Firms & Offices Products Geographical Index Publications Links
Structures / Georgia Dome
Browse by:
Name
Structural type
Function
Construction method
Geographic location
Year of completion

Recently added
Recently modified
Recently illustrated

Structurae web

Data submission
About Structurae
Advertising on Structurae
Imprint
Contact Structurae
Acknowledgements
Photos used on Structurae
About this data sheet:
Structure-ID: s0000372
Created on: 06/09/99
Modified on: 14/11/06


Georgia Dome

Built: 1990 - 1992
Status: in use
Location: Atlanta, Fulton County, Georgia, USA
Georgia Dome
Click on the image to enlarge it.
There is a total of 14 images.
Structural Type:
Tensegrity cable membrane structure
Function / usage:
Stadium / Arena

Persons involved with this structure
Legend: Phase of works
RoleNamePart of structure 
Architect Scott W. Braley
Structural engineer Matthys P. Levy
  Antranig Ouzonnian

Firms, offices, etc. involved with this structure
Legend: Phase of works
RoleNamePart of structure 
  Barton Malow Company
  Williams-Russell and Johnson Inc.
Owner State of Georgia
Client Georgia World Congress Center Authority
Architecture Heery International Inc.
  Rosser Fabrap International
  Thompson, Ventulett, Stainback & Associates
Wind tunnel testing Rowan Williams Davies & Irwin Inc.
Structural engineering Weidlinger Associates
Membrane supplier Birdair, Inc.

Technical information
DescriptionValue
Construction materials used
membrane  PTFE-coated glass-fiber fabric
building structure  precast concrete
reinforced concrete
Dimensions
  width 185 m
  height 82.5 m
  length 227 m
  seats 70 000
  membrane covered area 34 800 m2
  site area 56 700 m2
  building area 37 200 m2
  total floor area 9 490 m2

Chronology
November 1989- August 1990
Design period
March 1990- August 1992
Construction period.
May 1991- January 1992
Construction of membrane

Notes & Comments
2008 renovations to the Georgia Dome changed the color scheme, both interior and exterior, to red and black - Falcons colors. Also included in the renovations: improved lighting in concourse areas, improvements to concession areas, additional video replay boards, and improvements to the entry gate areas.

Relevant Web Sites
The following external links open in a new window. Structurae is not responsible for their content nor endorses it.
External LinkHousing the Spectacle: The Georgia Dome English
External LinkPBS: Building Big - Georgia Dome English
External LinkWikipedia: Georgia Dome English

Relevant Literature
* Ishii, Kazuo   Membrane Designs and Structures in the World (1st edition), Shinkenchiku-sha Co. Ltd, Tokyo (Japan) , ISBN 4786901466, 1999; pp. 180-183.
* Levy, M. P.   Floating Saddle Connections for the Georgia Dome, USA, in "Structural Engineering International", August 1994, n. 3 v. 4 .
* Picon, Antoine   L'art de l'ingénieur, Éditions du Centre Georges Pompidou, Paris (France) , ISBN 2858509115, 1997; pp. 210.
* Robbin, Tony   Engineering A New Architecture, Academy Editions, London (United Kingdom) , ISBN 0300061161, 1996; pp. 36-37.

 
Correct, change or add
data to this page.
Suggest a relevant
web page to this page.
Suggest a relevant
publication to this page.
A product of
Nicolas Janberg ICS
INTERNET CONTENT SERVICES
© 1998-2010 Nicolas Janberg ICS. All rights reserved.
Use of Structurae graphics is prohibited without prior approval.

Version 5.2
AddThis Social Bookmark Button
Structurae on Facebook