|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0000076 |
| Created on: |
28/10/98 |
| Modified on: |
28/05/08 |
|
 |
 |
|
 |  |  |
|
|
|
|
Structural Type:
|
|
| Replaced by: |
Tavanasa Bridge (1928)
|

| Legend: Phase of works |
| Role | Name | Part of structure |
| |
| Structural engineer |
Robert Maillart |
|
|
| Description | Value |
| arch |
reinforced concrete
|
|
| |
main span |
51 m |
|
| |
cost of construction |
CHF 28 000.00 |
|

| This bridge was destroyed in an avalanche in 1927 and replaced by a different arch design. |
|

|

 |
Billington, David P. Robert Maillart, Cambridge University Press, Cambridge (United Kingdom) , ISBN 0521571324, 1997; pp. 38-42, 136-9.
|
 |
Billington, David P. Robert Maillart and the Art of Reinforced Concrete, The MIT Press, Cambridge (USA) , ISBN 0262023105, 1990; pp. 10-13.
|
 |
Billington, David P. Robert Maillart's Bridges, Princeton University Press, Princeton (USA) , ISBN 0691024219, 1979; pp. 77-80.
|
 |
Billington, David P. The Tower and the Bridge, Princeton University Press, Princeton (USA) , ISBN 069102393X, 1983; pp. 158-159.
|
|
|
 |