Beginning of works: 1993
Completion: 2010
Status: in use

Project Type

Structure: Arch dam
Function / usage: Hydroelectric dam / plant
Material: Concrete dam

Location

Location: ,
Impounds:
  • Karoon River
Coordinates: 31° 35' 57.14" N    50° 28' 21" E
Show coordinates on a map

Technical Information

Dimensions

height 230 m
crest length 440 m
capacity for electric power generation 1 000 MW

Materials

dam structure reinforced concrete

Excerpt from Wikipedia

The Karun-4 Dam is an arch dam on the Karun River located at 180 km southwest of Shahr-e-Kord in the province of Chaharmahal and Bakhtiari, Iran. The Karun has the highest discharge of all the Iranian rivers. Ist construction is aimed at electric power supply of 2107 million kWh annually and controlling floods in the upper Karun.

The dam is a concrete double curvature arch-type and 230 metres (750 ft) high from the foundation. The arch dam design is an ideal one for a dam built in a narrow, rocky gorge to hold back water in a reservoir. The dam is curved. Because of the arch shape, the force of the backed up water presses downward against the dam and has the effect of strengthening the dam foundation. The dam withholds a reservoir with a surface area of 29 square kilometres (11 sq mi) and capacity of 2.19 cubic kilometres (1,780,000 acre⋅ft). The dam's first study was conducted in 1995 and river diversion began in 1997. Concrete pouring began in 2006 and the power plant began producing electricity in November 2010. On December 11, 2010, the second generator for the dam became operational and was connected to the grid. The dam will eventually have an installed capacity of 1,020 MW. The dam was inaugurated on 6 July 2011 by Iranian President Mahmood Ahmadinejad.

Objectives

It was built to fulfill the followings:

  • To produce an average annual hydropower energy as much as 2100 GW-h.
  • To join the cascade dams on the Karun River, hence regulate the flow in order to supply the water required by the industry and agriculture downstream.
  • To control the destructive floods of the Karun River.

Cost

The dam construction was costed 8600 billion Rials financed by public resources including national and local budget, domestic banks facilities, bonds, as well as foreign facilities (finance, loan, etc.).Initial estimate of annual income from the electricity production amounted to 1353 billion Rials (642 Rials per kilo watt hour).

Build Contractor

  1. Daelim (Korea) + Sato (Japan): Main Civil Works
  2. Ilbau (Austria) + Forman (Iran): Preconstruction Works
  3. Machine Sazi Arak (Iran): Hydraulic Steel Structures
  4. Farab (Iran) + Harbin (China): Mechanical Equipment
  5. Farab (Iran) + Elin (Austria): Electrical I&C and HVAC Equipment
  6. IEO (Iran): GIS Switchgear

Text imported from Wikipedia article "Karun-4 Dam" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20036220
  • Published on:
    07/04/2008
  • Last updated on:
    24/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine