0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Brennilis Nuclear Power Plant

General Information

Beginning of works: 1962
Completion: 1967
Status: out of service

Project Type

Structure: Cylindrical shell
Function / usage: Nuclear power plant
Material: Concrete structure

Location

Location: , , ,
Coordinates: 48° 21' 11.88" N    3° 52' 19.92" W
Show coordinates on a map

Technical Information

There currently is no technical data available.

Excerpt from Wikipedia

The Brennilis Nuclear Power Plant (EL-4) is a decommissioned site located in the Monts d'Arrée in the commune of Brennilis in Finistère, France.

History

The Commissariat à l'énergie atomique began construction of this experimental reactor moderated with heavy water and cooled with carbon dioxide (HWGCR) in 1962. The reactor had a planned output power of 70 MWe. The plant achieved criticality in December, 1966.

In 1971, however, the French government elected to use pressurized water reactor technology developed in the United States as their model design.

On August 15, 1975, two explosions slightly damaged a turbine and destroyed a telephone circuit. The Liberation Front of Brittany claimed responsibility. In 1979 the group destroyed electrical lines going from the plant to the grid, and with there being no grid to supply power to, the plant shut down. This was the only time in history that a terrorist group successfully stopped operation of a nuclear power plant.

In 1985 the reactor was shut down permanently. The cost of decommissioning is currently estimated to be 482 million euros, much greater than initial estimates.

Decommissioning experience

This nuclear plant marks the first decommissioning of a complete nuclear power station in France. EDF and CEA announced their intention to make this a transparent process so that it can be used as a model for future decommissioning operations at other plants.

The process is divided into 3 stages.

Stage 1

This stage began in 1985, and is similar to a refueling outage; the fuel is moved to the spent fuel pool, but new fuel is not loaded, and the fuel on site is eventually transported elsewhere. It consists of:

  • final shut-down
  • discharge of the nuclear fuel
  • draining of cooling circuits

Stage 2

In 1995, a public inquiry was held. In 1996, it was decided that a feasibility study for the "greening" of the site would be submitted by the end of 1999. Stage 2 began in 1997, consisting of:

  • decontamination and disassembling of the buildings except for the reactor itself
  • evacuation of the nuclear waste
  • containment of the reactor pressure vessel

On December 13, 2000, a rise in the ground water level caused a flood in the chemical processing building. In January 2001, a fire broke out in the joint inner building. In 2005, stage 2 was officially complete.

Stage 3

Stage 3 consists mostly of containing the reactor pressure vessel (RPV) and is currently underway.

  • dismantling of the steam generators
  • dismantling of the reactor pressure vessel
  • demolition of the containment building

Text imported from Wikipedia article "Brennilis Nuclear Power Plant" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20036080
  • Published on:
    04/04/2008
  • Last updated on:
    05/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine