0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 27 July 2012
Completion: 15 May 2017
Status: in use

Project Type

Function / usage: High-speed rail line

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

length 182 km + 32 km
number of tracks 2

Design Loads

design speed 320 km/h

Cost

cost of construction Euro 3 300 000 000

Participants

Conceding authority
Owner
Concessionaire
Design
Architecture
Co-contractor
Civil works
Steel construction
Water proofing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    10001215
  • Published on:
    20/11/2007
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine