Improved Design Method for Pre-stressed Water Tunnels
| Author(s): |
N. Radoncic K. Großauer W. Schubert H. Gober G. Heigerth |
|---|---|
| Medium: | journal article |
| Language(s): |
|
| Issue: | "Geomechanik und Tunnelbau", 2008, n. 5 v. 1 |
| Page(s): | 383-389 |
| DOI: | 10.1002/geot.200800056 |
| Abstract: |
The final design of the pumped-storage project Feldsee features a complex lining and pre-stress grouting concept, rendering the method presented by Seeber insufficient for an accurate determination of the system behaviour in all stages of construction and operation. A calculation procedure based on the matrix stiffness method has been implemented, allowing incorporation of multistage pre-stressing injections at different locations of a lining being composed of several layers with different mechanical properties. Based on the design obtained by applying the above method, another question of maximum allowable non-symmetric displacement of the pre-cast concrete segment arose. A parametric study has been used to determine the boundaries of asymmetric displacements throughout the pre-stressing procedure, allowing establishment of threshold values for the monitoring conducted during the pre-stressing injections. |
| Available from: |
|
Featured Product
TECU® Brass
TECU® Brass is a material with a reddish golden surface for impressive new façade solutions using copper.
Internal Information
| Reference-ID: | r0031969 |
|---|---|
| Created: | 20/01/2009 |
| Last Updated: | 27/02/2013 |

