0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Rion-Antirion Bridge – When a dream becomes reality

The Rion-Antirion Bridge – When a dream becomes reality
Author(s):
Presented at IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, published in , pp. 47-62
DOI: 10.2749/222137809796089188
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.1 MB

Opened to traffic in August of 2004, the Rion-Antirion Bridge crosses the Gulf of Corinth near Patras in western Greece. It consists of an impressive multi cable-stayed span bridge connected to the...
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009
Published in:
Page(s): 47-62 Total no. of pages: 16
Page(s): 47-62
Total no. of pages: 16
Year: 2009
DOI: 10.2749/222137809796089188
Abstract:

Opened to traffic in August of 2004, the Rion-Antirion Bridge crosses the Gulf of Corinth near Patras in western Greece. It consists of an impressive multi cable-stayed span bridge connected to the land by two approaches.

An exceptional combination of physical conditions made this project quite unusual : high water depth, deep strata of weak soil, strong seismic activity and fault displacements. In addition a risk of heavy ship collision had to be taken into account.

The structure has been designed in view of challenging severe earthquakes and ensuring the everyday serviceability of the link as well. To make the bridge feasible, innovative techniques had to be developed: The strength of the in-situ soil has been improved by means of inclusions; the bridge deck has been suspended on ist full length, and therefore isolated as much as it can be.

Keywords:
bridge capacity design pushover dry dock multi cable-stayed spans soil reinforcement inclusions yield theory wet dock

Structures and Projects