E. Pihl & Søn A.S.
Structures & Projects
Participation in the following structures and projects:
- Bjelland Bridge (2008)
- Busan-Geoje Tunnel (2010)
- Copenhagen International Airport Control Tower (2008)
- Great Belt East Bridge (1998)
- Jökulsá Canyon Bridge (1994)
- Kaldvell Bridge (2008)
- Malmö City Tunnel (2010)
- New Copenhagen Opera House (2008)
- Øresund Tunnel (2000)
- Reddalskanalen Bridge (2008)
- Royal Danish Theater (2008)
- Senqu River Bridge (1991)
- Triangeln Station (2010)
Space for a Company Logo!
This entry is currently a standard company entry. However, with a premium profile the presentation would be a lot different and adjustable, e.g. this would be replaced by the company logo.
Relevant Websites
There currently are no relevant websites listed.
Relevant Publications
There currently is no relevant literature listed.
Internal Information
| Firm-ID: | f002062 |
|---|---|
| Created: | 05/09/2002 |
| Last Updated: | 27/02/2013 |
