Köhler + Seitz Beraten und Planen GmbH
Structures & Projects
Participation in the following structures and projects:
- Alte Elbebrücke Meissen (2000)
- Bridge of Peace (1996)
- Brücke über das Mercedes-Benz Werk (1993)
- Buxach Viaduct (1987)
- Cologne–Frankfurt high-speed rail line (2002)
- Dasbach Viaduct
- Dessau Mulde Bridge (1998)
- Diepmannsbach Bridge at Remscheid-Lennep (1995)
- Eisenbachtalbrücke (1990)
- Elbebrücke Dresden (1998)
- Fischerdorf Bridge (1991)
- Franconia Bridge (1994)
- G3 Bridge
- Gauchachtalbrücke Döggingen (2002)
- Hagenbrücke (1998)
- Hagerwassertalbrücke (1991)
- Hallerbach Viaduct
- Hermann Liebmann Bridge (2004)
- Highway Overpass Ratingen-Schwarzbach (1991)
- Hirschfeld Viaduct (1997)
- Horkheim Overpass (1988)
- Hüttentalstrasse Footbridge (1996)
- Itztalbrücke (2007)
- Jarmen Bridge (2001)
- Kajang Ring Road Bridge No. 15 (2000)
- Kinzig Viaduct (1994)
- Kleine Striegis Viaduct (1995)
- Kuala Lumpur Monorail (2003)
- Lauertalbrücke (2004)
- Lauf Railroad Bridge over the A9 (I) (1995)
- Lauf Railroad Bridge over the A9 (II) (1995)
- Lotzebachtalbrücke (1997)
- Mainbrücke Bettingen (2001)
- Mainbrücke Spessart (1991)
- Marienbrücke (2004)
- Monorail Arch Bridge (2002)
- Monorail Frame 68 (2002)
- Muldeflutbrücke (1998)
- Neisse Bridge at Görlitz (1994)
- Nuremberg Transmission Tower (1980)
- Oberndorf Bridge (1994)
- Petuel Tunnel (2002)
- Retzbach-Zellingen Bridge (1993)
- Römerbrunnenweg Bridge (1989)
- Rottweil Bybass Bridge (2002)
- Rudolphstein Bridge (1996)
- Saubach Viaduct (1996)
- Schnaittach Viaduct (1998)
- Seitentalbrücke (1995)
- Sessles Viaduct (2002)
- Spree Valley Bridge at Bautzen (1997)
- Steinatal Industrial Bridge (1999)
- Steinatal Main Bridge (1999)
- Talbrücke bei Culitzsch (1993)
- Talbrücke Tautendorf (2001)
- Taxiway Bridge E1/East (2000)
- Taxiway Bridge West 1/North (2000)
- Taxiway Bridge West 1/South (2000)
- Trockau Footbridge
- U3 Metro Line (Nuremberg) (2013)
- Ulmbachtalbrücke (1994)
- Unionbrücke (2000)
- Wallbachtalbrücke (1998)
- Werra Valley Bridge at Eisfeld (2002)
- Weteritz Bridge (1995)
- Wild Gera Viaduct (2000)
- Wilkau-Hasslau Bridge (1995)
- Wilmshagen Green Crossing (2004)
- Wommen Viaduct (1993)
- Wörth Bridge (1979)
- Zenntalbrücke (1991)
- Zschonergrund Viaduct (2001)
Chronology
| 1962 | Founded by Wilhelm Köhler and Günter Seitz in Nuremberg. |
|---|
Related Companies
Subsidiaries
Relevant Persons
Relevant Websites
There currently are no relevant websites listed.
Relevant Publications
There currently is no relevant literature listed.
Internal Information
| Firm-ID: | f000003 |
|---|---|
| Created: | 01/01/1999 |
| Last Updated: | 27/02/2013 |
